轮机长面试常见问题
What is C/E’s responsibility?
1.Familiarization with company policy;
2.SMS and execution;
3.Assist the Master;
4.Over all in charge of all machinery and equipment in engine room including deck machinery;
5.Control and arrange supply bunker and lubricant;
6.Control and implement safety, pollution prevention related to engine department;
7.In charge of garbage control in engine room;
8.Training of next level of next level of engineer and ratings;
9.Update planned maintenance system; Reporting to Master on technical affecting or could affect safe operation of vessel;
10.Ensure regular maintenance of all machinery and equipment;
11.Recording related all above items.
How many safe margin is necessary when bunking?
Normal 5days or According to SMS.
What is a “Bunkering Plan”?
1.A bunkering plan is made according to the owner and/or charter’s order, the passage (voyage) plan, and capacity of the tanks, oil ROB, and so on.
2.A bunkering plan is made by the Chief Engineer and approved by the Master and the company.
3.Generally, the volume of the bunkered oil shouldn’t exceed 85% of tank capacity.
What will you do if the oil quantity supplied by the oil company is less than the agreed amount after bunkering?
1.Receipts should not be signed, regardless of any delay, until quantities are confirmed by all parties concerned.
2.Any dispute over the quantity or adverse specifications of bunkers taken shall be noted on the fuel receipt and the company should be advised accordingly.
Before bunkering, the fuel specifications are usually provided by the fuel supplier, do you remember the details of these fuel specifications?
1.The details of the fuel specifications include density, viscosity —maximum as applicable to the vessel, temperature as delivered, water content, sulfur content, flash point and so on.
2.All these specifications are very important.
3.All these specifications are identified at the front cover of BDN(BUNKER DELIVERY NOTE) or MSDS(Material safety data sheet) which suppiled by bunker supplier.
Describe the procedure for starting emergency generator.
1.Check the lube oil level in the crankcase and fuel oil level in the tank all in normal level;
2.Check to see if there is any leakage;
3.Check the air pressure if the generator is the air-started model; or check the battery voltage to see whether it is normal if the generator is of the battery start model;
4.Also make sure there aren’t any obstacles around the machine;
5.Put the test switch in “Manual” position, and manually start it after making sure that above-mentioned items in order;
6.If you use “Auto test” model, or “Black out” model to test the emergency generator, you must inform bridge duty officer and Chief Engineer. And you cannot carry it until you get the permit from both of them. Otherwise, you must wait;
7.“Auto test” must be carried out once every month. “Blackout” test must be carried out once every 3 months.
注意:在这里我们要知道什么是BLACK OUT及如何测试,另外应急发电机油箱里的油按照SLOAS要求应最少能够工作18小时,当机舱发生BLACK OUT时,应急发电机应该在45秒内自动启动。
请登录后发帖